FORM C.R.E. No. 24,
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
Main Head............. Bridges.
Sub. Head ............ Major Bridge No.38.
Work .................. Two 20' Girder at chain 88°00'
Drawing C.R.B. No.25371,
Item Quantity. DESCRIPTION. Rate. Unit. Cts. AMOUNT. 101 20,520 Excavation in founds. 8/- % oft 8,030 Timbering and pumping. 10/- % oft 205 1,000 Concrete in founda. 30/- % oft 1,010 102 Masonry in superstructure. 40/- % ert 280 Masonry coping and bedstones. 2,200 Dra stone backing- 2/ .ft. 2,810 10/- % oft 4,040 00 00 8 å spans 20 ft. gårders 500/- each 4,000 Spans 20 ft girders erection à painting. 100/- 8 800 Total 9,837 78 78 Contingincies 10% 983 78 78 Grand Total 10,821 56 5604
.gelisЯ notne noolwo
STATION
00
24
't
„MOITOGE HEX FINE
3TAMIT23
FORM C.R E. No. 24,
Kowloon Canton Railway.
91
BRITISH SECTION.
ESTIMATE.
༣ - ༩ ༩ ་
103, 40
bust nint
besti duf.
drew
Main Head.............
Sub. Head
Work
Bridges.
Major Bridge No.38.
Two 201 Girder at chain 88°00
Drawinh C.R.B. No.25371,
AMOUNT.
hantity.
DESCRIPTION.
Rate. Uuit.
Cts.
InicT
101 extonighnes
1
OFF 1
20,520 Excavation in founds.
Item Timbering and pumping.
8,030 Concrete in founda.
10/- % oft
+
205
1,000
30/- % oft
10100
Masonry in superstructure.
40/- % ert
280 Masonry oeping and bedstones.
2,200
Dra stone backing-
2/ .ft. 10/- % oft
2,810
4,040 00
560
* 8 8
00
80
00
å spans 20 ft. gårders
500/- each
Spans 20 ft girders erection à painting.
100/- ■
22 08
1,000 00
200 00
Total
Contingincies 10%
Grand Total
9,837 78
983 78
10,821 56